Choosing a contractor · 11 February 2026 · 6 min read

How to Choose a Shopfitter: 10 Questions to Ask

Quick answer: choose a shopfitter who manufactures in-house, can show completed projects in your sector, and will price the same scope you have given everyone else. Ask for proof of insurance, centre and landlord experience, a written programme, and who handles snagging and aftercare. The strongest signal is whether the person quoting the work is the person who has to build it.

Most shopfitting disputes are decided before anyone lifts a tool, at the point you choose who to appoint. These ten questions take ten minutes and save months.

The ten questions

Ask them all, and pay attention to how quickly the answers come. A contractor who owns their own workshop answers question one instantly.

  • 1. Do you manufacture in-house, or subcontract the joinery?
  • 2. Who will be my single point of contact from design to handover?
  • 3. Have you worked in this shopping centre or with this landlord before?
  • 4. What is your public liability cover, and can I see the certificate?
  • 5. Can I visit your workshop and see work in progress?
  • 6. How do you price variations once we are on site?
  • 7. What is realistically the programme, including landlord approvals?
  • 8. Who handles out-of-hours access, hoarding and waste?
  • 9. What does your snagging and handover process look like?
  • 10. What happens six months later if something fails?
OLLYWOOD team at work in the Cardiff workshop
Ask to visit the workshop, what you see is what you will get on site.

Why in-house manufacture matters

When the joinery is subcontracted, every detail question travels through a middleman, and every delay is somebody else's fault. When it is made in the same building as the drawing, problems get solved on the bench in an afternoon.

It also changes quality control. We see our own work leave the workshop and go up on site, which is a strong incentive to build it properly the first time.

CNC machined muscle-fibre texture detail on a Myomaster counter
In-house CNC and bench joinery means details survive from drawing to delivery.

Red flags

None of these are automatically disqualifying, but each one deserves a straight answer.

  • A single-page quote with no breakdown
  • No named project manager
  • Reluctance to show you completed work of a similar scale
  • A programme that ignores landlord approval time
  • Large up-front deposits with no staged payment schedule
OLLYWOOD installation of a bespoke commercial interior
A contractor who cannot show you comparable work is usually not the one who built it.

What good looks like

A good shopfitter tells you what will be difficult before you sign. They give you a programme with landlord approval built in, they photograph progress, and they hand over a unit that is ready to trade rather than ready to snag.

Known Source flagship shopfront at Westfield Stratford
Good shopfitters hand over units that are ready to trade, not ready to fix.

Project gallery

OLLYWOOD project delivery on site
Site delivery
OLLYWOOD craftsmanship detail on a fit-out
Craftsmanship detail
Naski bespoke timber counter
Bespoke counter
Unbound Padel cafe counter
Cafe counter

Want to test the ten questions on us? Book a workshop visit in Cardiff.