Myomaster bespoke retail kiosk by OLLYWOOD trading in Westfield London

Westfield London · Westfield Stratford · UK Wide

Retail kiosks built for Westfield standards.

Trading in a Westfield centre means a 360 degree design with nothing hidden, certified materials, a demise line you cannot cross and a night shift to install. We have done it, in both London centres, and we design for those rules from the first sketch.

510+
Projects Completed
20+
Years Project Management
34 × 5★
Google Reviews
Cardiff, Wales
Nationwide Coverage

How We Get You Trading

Design Guide to Opening Night.

01

Centre Design Guide First

We read the guide before we draw. Height limits, demise lines, sightlines and material rules shape the concept rather than being fixed afterwards.

02

Approval Pack

Full drawings, finishes, fire certification and method statements presented in the format the landlord expects, so approval is a formality not a fight.

03

Built in Cardiff

Joinery, solid surface, spray finishing, signage and lighting all made in our own workshop, dry fitted and checked before it leaves us.

04

Overnight Install

Delivered and assembled out of hours with our own crew, permits in place, mall handed back clean and trading ready.

Delivered in Westfield

Two Brands. Two Centres.

Myomaster kiosk front elevation at Westfield London
Myomaster, Westfield London
Known Source shopfront at Westfield Stratford
Known Source, Westfield Stratford
Known Source display wall joinery at Westfield
Known Source, display wall joinery

More detail on the format, costs and approvals sits on our retail kiosks service page, and the full build is covered in the project case studies.

Westfield Kiosk FAQs

Straight Answers.

Do you build kiosks for Westfield London and Westfield Stratford?

Yes. We have designed, manufactured and installed units in both centres, including the Myomaster kiosk at Westfield London and the Known Source shopfront and display walls at Westfield Stratford. We build in Cardiff and install overnight so trading is never interrupted.

What does Westfield require before a kiosk can be installed?

A design submission that meets the centre design guide, drawings and finishes for landlord approval, fire certification for the materials used, evidence of accessibility compliance, plus RAMS, insurance and contractor accreditation before you get an out-of-hours works permit.

How long does landlord approval usually take?

Allow three to five weeks from first concept to written approval, running in parallel with our detailed design. Rejections are almost always about sightlines, demise line overhangs, exposed back-of-house or missing fire certification, so we design those out at the start.

How is a Westfield installation carried out?

In sections, at night, through the service routes agreed with centre management. A typical kiosk lands over one to three nights with the mall clean and trading the next morning.

What does a Westfield standard kiosk cost?

Bespoke kiosks start from £45,000 + VAT fully installed, covering design, landlord approval, manufacture, finishing, delivery and out-of-hours installation. Food and beverage units cost more because of extraction, water, drainage and equipment integration.